Showing posts with label Workability Of Concrete. Show all posts
Showing posts with label Workability Of Concrete. Show all posts

Friday, March 10, 2017

Measurement Of Workability

-Many different methods to measure workability
-Most common are Slump Cone Test & Compacting Factor Test
-Ball Penetration
-Flow Table Test

-Vebe Test

7.Use Of Admixture

-Most Important Factor which affects the workability
-Plasticizers, Super-Plasticizers

6.Grading Of Aggregates

-Maximum influence on workability
-Well graded aggregate has least amount of voids

-Better grading>Less Void Content>Higher Workability

5.Surface Texture Of Aggregate

-Surface area of rough texture is more

-Smooth aggregates will have higher workability

4.Shape Of Aggregate

-Angular, elongated or flaky aggregates makes the concrete very harsh

-Rounded or cubical shape aggregates contributes to better workability

3.Size Of Aggregate

-Bigger the size of aggregate the less is the surface area
-Less amount of water is required

-Bigger size of aggregate will give higher workability

2.Mix Proportion

-Higher the aggregate cement ratio the lower will be workability
-If rich concrete with lower aggregate cement ratio then workability of concrete will be more

1.Water Content

-Significant influence on the workability
-Higher the water content higher will be workable concrete
-Usually at site supervisors add more water

-Higher quantity of cement should also be added if water is being added

Factors Affecting Workability

-Water Content
-Mix Proportion
-Size Of Aggregate
-Shape Of Aggregate
-Surface Texture Of Aggregate
-Grading Of Aggregate

-Use Of Admixture

Workability of Concrete

-Flow of concrete
-Its placement without segregation, without loss of homogeneity
-Can be compacted & finished easily